[{"data":1,"prerenderedAt":640},["ShallowReactive",2],{"sanity-1MfbnHAseR":3,"sanity-2w8UqznAN6":30,"sanity-rL6AzE7Ccq":537,"sanity-i8JUreSf1a":561,"sanity-26lUdxxEPw":630,"sanity-oxZyK26MyS":638},[4],{"_createdAt":5,"_id":6,"_rev":7,"_system":8,"_type":6,"_updatedAt":11,"office_address":12,"office_contact":19,"office_hours":24},"2024-10-21T15:31:56Z","options","o0Z5oBPzurFYWa77gcSjxF",{"base":9},{"id":6,"rev":10},"LKL3bigAMfl2dNRmYc1OCn","2026-04-10T20:49:49Z",{"_type":13,"city":14,"country":15,"name_number":16,"postcode":17,"street":18},"address","Scorrier, Redruth","United Kingdom","Warvena Construction","TR16 5FG","Unit 2, Cornwall Business Park West, Space to Work",{"_type":20,"email":21,"instagram":22,"phone":23},"contact","info@warvenaconstruction.co.uk","https://www.instagram.com/warvena_construction/","01872 300856",[25],{"_key":26,"_type":27,"day":28,"times":29},"cdf4a287633d","office_hours_item","Monday to Friday","9am to 5pm",[31],{"_createdAt":32,"_id":33,"_rev":34,"_system":35,"_type":38,"_updatedAt":39,"components":40,"excerpt":530,"seo":531,"slug":534,"title":46},"2026-06-02T15:38:06Z","be7bc62a-dced-41f6-a0d8-93c17f630865","4MZ9RhYTPkZ7yEZAt6eXsI",{"base":36},{"id":33,"rev":37},"WXpA0q0NKgyAdMHumAF8lG","blog","2026-06-02T16:57:22Z",[41,52,118,187,251,315,379,386,444],{"_key":42,"_type":43,"content":44,"media":48,"size":50,"type":51},"d8ce9d93e59a","hero",{"text_align":45,"title":46,"title_size":47},"left","What is Early Contractor Involvement? The ECI Framework Explained","normal",{"media_type":49},"image","large","default",{"_key":53,"_type":54,"content":55,"layout":110},"665c04a1d8ee","content_area",{"animate_title":56,"text":57,"title_size":109},false,[58,68,76,84],{"_key":59,"_type":60,"children":61,"markDefs":67,"style":47},"a5aec02d8925","block",[62],{"_key":63,"_type":64,"marks":65,"text":66},"8cf7beb85e7f","span",[],"For decades, the UK construction industry relied on an adversarial procurement route: the traditional design-bid-build method. A client hires an architect, a design is finalized independently, and the drawings are then sent out to various builders to compete on price.",[],{"_key":69,"_type":60,"children":70,"markDefs":75,"style":47},"b3c2ce5ce6ca",[71],{"_key":72,"_type":64,"marks":73,"text":74},"591a8cf08501",[],"The results of this siloed approach are well-documented: lengthy legal disputes, missed deadlines, site complications, and compromised architectural visions.",[],{"_key":77,"_type":60,"children":78,"markDefs":83,"style":47},"f9bb85d474d2",[79],{"_key":80,"_type":64,"marks":81,"text":82},"c35ba375b245",[],"Early Contractor Involvement (ECI) turns this fragmented model on its head. ECI is a collaborative procurement strategy that introduces the main contractor to the project during the design phase—long before ground is broken. By breaking down the walls between the client, the architect, and the builder, ECI ensures that a project is optimized for technical execution, scheduling, and structural buildability from day one.",[],{"_key":85,"_type":60,"children":86,"markDefs":105,"style":47},"cdab16cfd16b",[87,92,96,101],{"_key":88,"_type":64,"marks":89,"text":91},"91515bb844f7",[90],"strong","Looking for a financial breakdown?",{"_key":93,"_type":64,"marks":94,"text":95},"72f1211cc132",[]," While this guide explains the operational mechanics and contractual framework of ECI, you can read our companion piece on ",{"_key":97,"_type":64,"marks":98,"text":100},"632a2b35dc5b",[99],"fb82163221c5","How Early Contractor Involvement Controls Cost",{"_key":102,"_type":64,"marks":103,"text":104},"73acc042b39c",[]," to see exactly how this model protects your project budget.",[106],{"_key":99,"_type":107,"href":108},"link","https://www.google.com/search?q=/blogs/how-early-contractor-involvement-controls-cost","small",{"spacing":111,"theme":115},{"_type":112,"include_section_padding_bottom":56,"include_section_padding_top":56,"section_padding_bottom":113,"section_padding_top":114},"spacing","section-padding-bottom","section-padding-top",{"_type":116,"theme":117},"theme","theme-light bg-white",{"_key":119,"_type":54,"content":120,"layout":181},"1b4e4f9312a0",{"animate_title":56,"text":121,"title":180,"title_size":109},[122,130,144,156,168],{"_key":123,"_type":60,"children":124,"markDefs":129,"style":47},"da21dde25920",[125],{"_key":126,"_type":64,"marks":127,"text":128},"977a9a51bbc6",[],"The primary goal of ECI is to align design aspirations with physical construction reality. Instead of treating the builder as a simple tool for execution, ECI treats them as a technical consultant during the planning phases. The framework focuses on four operational objectives:",[],{"_key":131,"_type":60,"children":132,"level":141,"listItem":142,"markDefs":143,"style":47},"3d89545d6d4e",[133,137],{"_key":134,"_type":64,"marks":135,"text":136},"c5efa761cda7",[90],"Risk Elimination:",{"_key":138,"_type":64,"marks":139,"text":140},"5c12eda59b39",[]," Identifying structural, logistical, and site-specific hazards before they impact the live site environment.",1,"bullet",[],{"_key":145,"_type":60,"children":146,"level":141,"listItem":142,"markDefs":155,"style":47},"57fe1e271331",[147,151],{"_key":148,"_type":64,"marks":149,"text":150},"0d783e47101e",[90],"Buildability Optimization:",{"_key":152,"_type":64,"marks":153,"text":154},"2a1ed93f5d08",[]," Streamlining complex architectural geometries to make them practical, safe, and highly efficient for site trades.",[],{"_key":157,"_type":60,"children":158,"level":141,"listItem":142,"markDefs":167,"style":47},"292f71c8edcd",[159,163],{"_key":160,"_type":64,"marks":161,"text":162},"d64964a152d3",[90],"Program Acceleration:",{"_key":164,"_type":64,"marks":165,"text":166},"4c81f6749c64",[]," Mapping out long-lead material procurement schedules and utility connection frameworks early to prevent live site pauses.",[],{"_key":169,"_type":60,"children":170,"level":141,"listItem":142,"markDefs":179,"style":47},"aaca8cb27817",[171,175],{"_key":172,"_type":64,"marks":173,"text":174},"4b8cf3ef272f",[90],"Supply Chain Integration:",{"_key":176,"_type":64,"marks":177,"text":178},"faf362c8b455",[]," Bringing specialized subcontractors into the modeling phase to resolve system conflicts before manufacturing begins.",[],"The Core Objectives of ECI",{"spacing":182,"theme":186},{"_type":112,"include_section_padding_bottom":183,"include_section_padding_top":183,"section_padding_bottom":184,"section_padding_top":185},true,"section-padding-bottom-xs","section-padding-top-xs",{"_type":116,"theme":117},{"_key":188,"_type":54,"content":189,"layout":248},"90fb598bd0fb7401600088c155814507",{"animate_title":56,"text":190,"title":247,"title_size":109},[191,199,207,215,223,231,239],{"_key":192,"_type":60,"children":193,"markDefs":198,"style":47},"1345da0ea106",[194],{"_key":195,"_type":64,"marks":196,"text":197},"0dd5dbc98458",[],"To understand how ECI operates, it helps to see how a specialist builder’s technical input transforms the standard Royal Institute of British Architects (RIBA) project stages:",[],{"_key":200,"_type":60,"children":201,"markDefs":206,"style":47},"98079a711458",[202],{"_key":203,"_type":64,"marks":204,"text":205},"0bee935f67ff",[],"RIBA Stage 2: Concept Design",[],{"_key":208,"_type":60,"children":209,"markDefs":214,"style":47},"0e00037e122f",[210],{"_key":211,"_type":64,"marks":212,"text":213},"fe9ba97ef1c4",[],"While the architect is sketching layouts and exploring spatial configurations, the main contractor reviews structural concepts. This early sanity check ensures the core design ideas align with fundamental structural physics and site constraints before extensive hours are spent on detailed drafting.",[],{"_key":216,"_type":60,"children":217,"markDefs":222,"style":47},"50df12828026",[218],{"_key":219,"_type":64,"marks":220,"text":221},"878abc596d1d",[],"RIBA Stage 3: Spatial Coordination (Planning Preparation)",[],{"_key":224,"_type":60,"children":225,"markDefs":230,"style":47},"960f54343173",[226],{"_key":227,"_type":64,"marks":228,"text":229},"5cc70af78c9b",[],"As structural engineering concepts and planning documents take shape, the contractor performs rigorous site logistics and engineering reviews. In Cornwall, this includes evaluating steep coastal terrain, machinery access restrictions for narrow rural lanes, and analyzing micro-climates for structural exposure and weatherproofing.",[],{"_key":232,"_type":60,"children":233,"markDefs":238,"style":47},"87f1132cd5c0",[234],{"_key":235,"_type":64,"marks":236,"text":237},"32029de241a2",[],"RIBA Stage 4: Technical Design",[],{"_key":240,"_type":60,"children":241,"markDefs":246,"style":47},"d4dfe29b8445",[242],{"_key":243,"_type":64,"marks":244,"text":245},"96040e7e0002",[],"Before construction documentation is signed off for building regulations, the contractor carries out a comprehensive sweep of technical detailing. This is especially crucial for specialized low-energy or Passivhaus builds, where we cross-reference airtightness boundaries, insulation interfaces, thermal bridging details, and Mechanical Ventilation with Heat Recovery (MVHR) ducting layouts to ensure compliance with strict performance standards.",[],"How ECI Maps to the RIBA Plan of Work",{"spacing":249,"theme":250},{"_type":112,"include_section_padding_bottom":183,"include_section_padding_top":56,"section_padding_bottom":184,"section_padding_top":114},{"_type":116,"theme":117},{"_key":252,"_type":54,"content":253,"layout":312},"0ad441c019aa880449e5d8e7eedaa84a",{"animate_title":56,"text":254,"title":311,"title_size":109},[255,263,271,279,287,295,303],{"_key":256,"_type":60,"children":257,"markDefs":262,"style":47},"f7c283925d0a",[258],{"_key":259,"_type":64,"marks":260,"text":261},"3a6d726d780b",[],"When you bring Warvena to the design table under an ECI framework, the benefits ripple across the entire operational lifecycle of your build:",[],{"_key":264,"_type":60,"children":265,"markDefs":270,"style":47},"e490840eb743",[266],{"_key":267,"_type":64,"marks":268,"text":269},"5b083c8966d9",[],"1. Seamless Technical Resolution",[],{"_key":272,"_type":60,"children":273,"markDefs":278,"style":47},"68413fd49b06",[274],{"_key":275,"_type":64,"marks":276,"text":277},"97e592a56208",[],"Late-stage structural changes can ruin the clean lines of a building. Early technical analysis preserves design integrity. By reviewing structural framing methods or modified foundation interfaces early, we can resolve complex engineering hurdles behind the scenes while keeping the architect’s original aesthetic completely intact.",[],{"_key":280,"_type":60,"children":281,"markDefs":286,"style":47},"aa10be1d382a",[282],{"_key":283,"_type":64,"marks":284,"text":285},"b9e44eade38e",[],"2. Proactive Supply Chain Management",[],{"_key":288,"_type":60,"children":289,"markDefs":294,"style":47},"d95648fede77",[290],{"_key":291,"_type":64,"marks":292,"text":293},"f29a639df9a4",[],"With global lead times for specialized components like triple-glazed timber windows, air-source heat pumps, and solar arrays stretching across several months, reactive ordering causes immediate delays. Through ECI, we isolate these long-lead items early and secure manufacturer production slots months in advance, completely avoiding construction delays once the site goes live.",[],{"_key":296,"_type":60,"children":297,"markDefs":302,"style":47},"8b57304c5344",[298],{"_key":299,"_type":64,"marks":300,"text":301},"1b11f1c3bf06",[],"3. Integrated Specialist Expertise",[],{"_key":304,"_type":60,"children":305,"markDefs":310,"style":47},"32943ee37127",[306],{"_key":307,"_type":64,"marks":308,"text":309},"472ed251abf7",[],"Modern architectural homes rely on sophisticated, highly integrated infrastructure. ECI allows us to bring key supply chain specialists—such as solar engineers, home automation experts, and timber frame fabricators—into the room during the design phase, integrating their technical workflows flawlessly into the architect's primary building information model (BIM).",[],"The Tangible Operational Benefits of ECI",{"spacing":313,"theme":314},{"_type":112,"include_section_padding_bottom":183,"include_section_padding_top":56,"section_padding_bottom":184,"section_padding_top":114},{"_type":116,"theme":117},{"_key":316,"_type":54,"content":317,"layout":376},"2c313e09a2ddae99dad5f59d6683bd4a",{"animate_title":56,"text":318,"title":375,"title_size":109},[319,332,359,367],{"_key":320,"_type":60,"children":321,"markDefs":331,"style":47},"ab1c8edf5106",[322,326],{"_key":323,"_type":64,"marks":324,"text":325},"53dce5b6b9d2",[],"A common question from clients is: ",{"_key":327,"_type":64,"marks":328,"text":330},"abeef7e1eee9",[329],"em","“If I involve a builder early, am I legally bound to build the house with them?”",[],{"_key":333,"_type":60,"children":334,"markDefs":356,"style":47},"4dc388017142",[335,339,343,347,352],{"_key":336,"_type":64,"marks":337,"text":338},"979cf338b1b6",[],"The answer is ",{"_key":340,"_type":64,"marks":341,"text":342},"b6d81d77d6f0",[90],"no",{"_key":344,"_type":64,"marks":345,"text":346},"7df2e6f99afd",[],". ECI is formalized through a ",{"_key":348,"_type":64,"marks":349,"text":351},"1f353e925d07",[90,350],"e98d0fe347b1","Pre-Construction Services Agreement (PCSA)",{"_key":353,"_type":64,"marks":354,"text":355},"f1431c7f8738",[350],".",[357],{"_key":350,"_type":107,"href":358},"https://warvenaconstruction.co.uk/blogs/pcsa-agreements-explained",{"_key":360,"_type":60,"children":361,"markDefs":366,"style":47},"b8fa85b38ea7",[362],{"_key":363,"_type":64,"marks":364,"text":365},"089396e744fd",[],"A PCSA is a standalone, short-term professional contract. You pay the contractor a defined fee solely for their pre-construction expertise, estimating time, site investigations, and engineering consultancy services.",[],{"_key":368,"_type":60,"children":369,"markDefs":374,"style":47},"b5d5aa8f1631",[370],{"_key":371,"_type":64,"marks":372,"text":373},"2b574c1705ca",[],"Once RIBA Stage 4 is complete, the technical designs are finalized, and a transparent, open-book build methodology is agreed upon, the PCSA concludes. At that point, you transition naturally into a standard construction contract (such as a JCT framework) for the physical build phase. If you choose not to proceed with that builder, you retain full ownership of the optimized designs, engineering data, and structural models generated during the PCSA period.",[],"Contractual Framework: How is ECI Delivered?",{"spacing":377,"theme":378},{"_type":112,"include_section_padding_bottom":183,"include_section_padding_top":56,"section_padding_bottom":184,"section_padding_top":114},{"_type":116,"theme":117},{"_key":380,"_type":54,"content":381,"layout":383},"67ae6c461530",{"animate_title":56,"title":382,"title_size":109},"Frequently Asked Questions",{"spacing":384,"theme":385},{"_type":112,"include_section_padding_bottom":56,"include_section_padding_top":56,"section_padding_bottom":113,"section_padding_top":114},{"_type":116,"theme":117},{"_key":387,"_type":388,"accordion":389,"content":439,"layout":441},"d9bc81689100","accordion",[390,403,415,427],{"_key":391,"_type":392,"text":393,"title":402},"7ddac8832c90","accordion_item",[394],{"_key":395,"_type":60,"children":396,"markDefs":401,"style":47},"392900230112",[397],{"_key":398,"_type":64,"marks":399,"text":400},"27ab56b17ff3",[],"Competitive tendering often encourages builders to bid low just to win the job, leading to hidden variations and aggressive cost-claiming once on site. Furthermore, if all competitive tenders come back significantly over your budget, you face expensive redesign fees with your architect. ECI guarantees buildability and budget alignment from the start.",[],"Why shouldn't I just wait for competitive tendering?",{"_key":404,"_type":392,"text":405,"title":414},"09668e1caab4",[406],{"_key":407,"_type":60,"children":408,"markDefs":413,"style":47},"7068aa85a5f5",[409],{"_key":410,"_type":64,"marks":411,"text":412},"f27211637eb5",[],"While ECI is highly critical for complex architectural structures and high-performance eco-homes, it provides massive advantages to any project with tight budget constraints or challenging site logistics. Knowing exactly what a project will cost before submitting planning permission saves time and money on any scale.",[],"Does ECI work for smaller extensions or only large-scale new builds?",{"_key":416,"_type":392,"text":417,"title":426},"279767ee3379",[418],{"_key":419,"_type":60,"children":420,"markDefs":425,"style":47},"b99649691348",[421],{"_key":422,"_type":64,"marks":423,"text":424},"ec8e4f845c00",[],"ECI actually protects and empowers the architect. Instead of having their completed designs compromised by arbitrary cost cuts at a late stage, the architect can design with total confidence, knowing that every line they draw is structurally and financially viable.",[],"How does ECI protect the architect’s role?",{"_key":428,"_type":392,"text":429,"title":438},"25164db0aecf",[430],{"_key":431,"_type":60,"children":432,"markDefs":437,"style":47},"792b644d7c97",[433],{"_key":434,"_type":64,"marks":435,"text":436},"cc709d3f98bc",[],"The most predictable builds are the ones that are stress-tested on paper first. By embracing Early Contractor Involvement, you replace uncertainty with precision, protecting your investment and your architectural vision.",[],"Build with Confidence from Day One",{"title":440},"                          ",{"spacing":442,"theme":443},{"_type":112,"include_section_padding_bottom":56,"include_section_padding_top":56,"section_padding_bottom":113,"section_padding_top":114},{"_type":116,"theme":117},{"_key":445,"_type":54,"content":446,"layout":527},"423f3247c255",{"animate_title":56,"text":447,"title":526,"title_size":109},[448,489,497,508,515],{"_key":449,"_type":60,"children":450,"markDefs":482,"style":47},"88a09f754ab0",[451,456,460,465,469,473,478],{"_key":452,"_type":64,"marks":453,"text":455},"222ca8ee5eee",[454],"c4e891b4083f","Warvena",{"_key":457,"_type":64,"marks":458,"text":459},"18e276881253",[]," are ",{"_key":461,"_type":64,"marks":462,"text":464},"24e78da42e15",[463],"6c6022ac01c4","TrustMark registered",{"_key":466,"_type":64,"marks":467,"text":468},"93b822c149a9",[90],",",{"_key":470,"_type":64,"marks":471,"text":472},"66b49fe3d8b2",[]," ",{"_key":474,"_type":64,"marks":475,"text":477},"f4fc11334500",[476],"6930f3bf5405","Passivhaus-experienced builders",{"_key":479,"_type":64,"marks":480,"text":481},"6ebfb1de0c1e",[]," based in Redruth. We work across Cornwall with architects, developers and private clients to deliver homes that perform.",[483,485,487],{"_key":454,"_type":107,"href":484},"https://warvenaconstruction.co.uk/",{"_key":463,"_type":107,"href":486},"https://www.trustmark.org.uk/",{"_key":476,"_type":107,"href":488},"https://www.passivhaustrust.org.uk/",{"_key":490,"_type":60,"children":491,"markDefs":496,"style":47},"86f335a8de12",[492],{"_key":493,"_type":64,"marks":494,"text":495},"b5f56bda5c32",[],"",[],{"_key":498,"_type":60,"children":499,"markDefs":505,"style":47},"92d541662d51",[500],{"_key":501,"_type":64,"marks":502,"text":504},"5d950988dba5",[90,503],"a8694e4d2317","Get in touch ↗",[506],{"_key":503,"_type":107,"href":507},"https://warvenaconstruction.co.uk/contact",{"_key":509,"_type":60,"children":510,"markDefs":514,"style":47},"aca19836b333",[511],{"_key":512,"_type":64,"marks":513,"text":495},"3a33d48f6e82",[],[],{"_key":516,"_type":60,"children":517,"markDefs":523,"style":47},"a181742f7af6",[518],{"_key":519,"_type":64,"marks":520,"text":522},"6e36cc20519d",[90,521],"c7bc6b3acd6d","View projects↗",[524],{"_key":521,"_type":107,"href":525},"https://warvenaconstruction.co.uk/projects","THINKING ABOUT A HIGH-PERFORMANCE BUILD IN CORNWALL?",{"spacing":528,"theme":529},{"_type":112,"include_section_padding_bottom":183,"include_section_padding_top":183,"section_padding_bottom":184,"section_padding_top":185},{"_type":116,"theme":117},"Building a bespoke or high-performance home involves complex moving parts. Discover how Early Contractor Involvement (ECI) replaces the adversarial traditional tender process with a collaborative framework that guarantees project success.",{"meta_description":532,"meta_title":533},"What is Early Contractor Involvement? Learn how ECI unites architects, clients, and builders early to de-risk projects, control budgets, and protect design.","Early Contractor Involvement / ECI construction",{"_type":535,"current":536},"slug","what-is-early-contractor-involvement-the-eci-framework-explained",[538],{"navigation_items":539},[540,547,552,557],{"external":541,"external_label":541,"link_type":542,"page":543,"page_label":546},null,"page",{"slug":544,"title":546},{"_type":535,"current":545},"projects","Projects",{"external":541,"external_label":541,"link_type":542,"page":548,"page_label":551},{"slug":549,"title":551},{"_type":535,"current":550},"services","Services",{"external":541,"external_label":541,"link_type":542,"page":553,"page_label":541},{"slug":554,"title":556},{"_type":535,"current":555},"faq","FAQs",{"external":541,"external_label":541,"link_type":542,"page":558,"page_label":560},{"slug":559,"title":560},{"_type":535,"current":20},"Contact",[562],{"logos":563,"navigation_items":608},[564,572,578,584,590,596,602],{"_key":565,"_type":566,"alt":567,"image":568},"f60248ee0661","logo","Wild Kernow",{"_type":49,"asset":569},{"_ref":570,"_type":571},"image-469f63e547d1ac942bf06073a1e11857b5b40435-156x156-png","reference",{"_key":573,"_type":566,"alt":574,"image":575},"c5d3ced3cf51","Passivhaus",{"_type":49,"asset":576},{"_ref":577,"_type":571},"image-ae32d3e25752bf38c75fc9ced7d04bc9ebd14423-197x156-png",{"_key":579,"_type":566,"alt":580,"image":581},"ba9469a4c4a8","AECB",{"_type":49,"asset":582},{"_ref":583,"_type":571},"image-4216c72a55a6ccc2fb9419578f1ffb4f9790851b-193x108-png",{"_key":585,"_type":566,"alt":586,"image":587},"b1496fee8ac6","millboard installers",{"_type":49,"asset":588},{"_ref":589,"_type":571},"image-087c3235662d71cf2717c479abdb22733d9ff086-280x100-png",{"_key":591,"_type":566,"alt":592,"image":593},"4f433012f9cf","Trustmark",{"_type":49,"asset":594},{"_ref":595,"_type":571},"image-2899ee5743fa96d72db2c6d48a9c615a6c395ffe-259x56-png",{"_key":597,"_type":566,"alt":598,"image":599},"dde59ef3e607","Tradesperson",{"_type":49,"asset":600},{"_ref":601,"_type":571},"image-b929d3e49b3255f4e2c6186b066997496dd54e9c-155x156-png",{"_key":603,"_type":566,"alt":604,"image":605},"d68497325d53","Master builders",{"_type":49,"asset":606},{"_ref":607,"_type":571},"image-477ee60ed84cec23fd456599ef0c6a5e543eb9de-92x156-png",[609,615,618,623,626],{"external":541,"external_label":541,"link_type":542,"page":610,"page_label":614},{"slug":611,"title":613},{"_type":535,"current":612},"/","Home ","Home",{"external":541,"external_label":541,"link_type":542,"page":616,"page_label":546},{"slug":617,"title":556},{"_type":535,"current":555},{"external":541,"external_label":541,"link_type":542,"page":619,"page_label":541},{"slug":620,"title":622},{"_type":535,"current":621},"about","About",{"external":541,"external_label":541,"link_type":542,"page":624,"page_label":541},{"slug":625,"title":556},{"_type":535,"current":555},{"external":541,"external_label":541,"link_type":542,"page":627,"page_label":629},{"slug":628,"title":560},{"_type":535,"current":20},"Get in touch",[631],{"_createdAt":5,"_id":6,"_rev":7,"_system":632,"_type":6,"_updatedAt":11,"office_address":634,"office_contact":635,"office_hours":636},{"base":633},{"id":6,"rev":10},{"_type":13,"city":14,"country":15,"name_number":16,"postcode":17,"street":18},{"_type":20,"email":21,"instagram":22,"phone":23},[637],{"_key":26,"_type":27,"day":28,"times":29},[639],{"navigation_items":541},1780428172937]